Eastern knows the precise, efficient, and environmentally-safe methods, products, and technology to get your next paving project done right.

workers-on-asphalting-paver-during-road-street-rep-2023-11-27-05-07-30-utc.jpg

PLANNING & DESIGN

  • Site Assessment: Evaluate the site for soil conditions, drainage, and existing infrastructure.

  • Design Layout: Create a design that includes the layout of the parking spaces, traffic flow, drainage systems, and any other specific requirements.

  • Permits and Approvals: Obtain necessary permits and approvals from local authorities.

BASE LAYER INSTALLATION

Base Layer: Apply a layer of base material (crushed stone or asphalt base) and compact it to create a solid and stable foundation for the top asphalt layers.

6-20-21 Sandusky Michigan-Web-8.jpg
Snow Plowing
6-20-21 Sandusky Michigan-Web-47.jpg

ASPHALT INSTALLATION

  • First Asphalt Layer (Binder Course): Lay the first layer of asphalt, known as the binder course, which provides structural strength. Compact this layer thoroughly.

  • Top Asphalt Layer (Surface Course): Lay the top layer of asphalt, known as the surface course. This layer provides a smooth, durable, and weather-resistant surface. Compact this layer as well.

  • Edging: Install curbs or other edging materials as needed.

  • Striping and Markings: Paint lines for parking spaces, arrows, and other necessary markings. Add any signage required for traffic management.

Sidewalks

FINISHING TOUCHES

  • Edging: Install curbs or other edging materials as needed.

  • Striping and Markings: Paint lines for parking spaces, arrows, and other necessary markings. Add any signage required for traffic management.

  • Inspection: Conduct a thorough inspection to ensure that the paving meets all specifications and quality standards.

  • Repairs and Adjustments: Address any issues or defects identified during the inspection.

6-20-21 Sandusky Michigan-Web-56.jpg
DeIcing
Paving Update-1.jpg

CLEANUP AND FINALIZATION

  • Cleanup: Remove any construction debris and clean the site.

  • Final Walkthrough: Perform a final walkthrough with the client to ensure satisfaction.

Snow Relocation

MAINTENANCE PLANNING

Maintenance Schedule: Provide the client with a maintenance plan to ensure the longevity of the pavement. This may include regular inspections, seal coating, crack filling, and other upkeep activities.